Forum pracy nad projektem wskrzeszenia The Forge Forum Index Forum pracy nad projektem wskrzeszenia The Forge

 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   GalleriesGalleries   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

belstaff bolsas Wu Yan LJ-15 standard high-speed p

 
Post new topic   Reply to topic    Forum pracy nad projektem wskrzeszenia The Forge Forum Index -> Forum
View previous topic :: View next topic  
Author Message
defgf60hv
Cholerny Spammer



Joined: 03 Nov 2010
Posts: 886
Read: 0 topics

Location: England

PostPosted: Wed 4:47, 20 Apr 2011    Post subject: belstaff bolsas Wu Yan LJ-15 standard high-speed p

4, the new bridge construction team approach each investigation,[link widoczny dla zalogowanych], no construction capacity has been removed.
including special foundation treatment, slope protection and roadbed fill no other plans to start production. Because land acquisition and civil disputes, plans face obstacles constrain the feasibility of this month, leading to the bridge substructure and infrastructure to carry out only limited, completely disrupted the production plans directly affect the construction schedule.
deadline is land acquisition and resettlement issues such as civil dispute has not been effectively resolved, resulting in slow progress, production equipment investment and the current production has been out of touch, work teams, Mechanical serious slowdown. Work surface that can be implemented now have all started, according to the progress of the feasibility of the current production statistics: pile 30, Articles 1.87 roadbed fill, excavation,[link widoczny dla zalogowanych], special subgrade treatment, culverts, protection, and are subject to restrictions shall not carry out, in this months can only solve the fundamental problem is to be able to be fully under normal production in order to ensure that the production schedule. Finally, no matter how difficult, we have confidence in the project department staff work progress of the progress this quarter in a strong increase.


5, sample production: 1536 groups of concrete, mortar and 84 groups, 124 groups paste,

1) bridge foundation: plans to complete 105
3, gravel: 4826.9 square approach, testing 14 times, qualified 14 times.

6,[link widoczny dla zalogowanych], 6 pile testing, a total of 121, passing 121.
specimen compression: 908 groups of concrete specimens (including 7 days 240 group, 28-day 668 group)


10) bridge, the channel plans a complete 0.75;

leaders at all levels, all units participating in the construction Brothers:

VI. Construction scheduling next month:
VII. Needs that exist in the construction supervision of the owners or problems:
Wu Yan LJ-15 standard high-speed project department in May to report material


Wu Yan LJ-15 standard high-speed project department in May to report material
Good afternoon!


7) Cut: 10 Articles plan to complete the 22.8 Articles;




2, continue to increase the operational capability of the professional and technical personnel, I contact the Department of the bridge foundation engineers, engineers, and one each has been admitted.



IV. Quality control of:




6) Precast Beam: Plan 80 film, completed 90;
11) Plan a culvert, complete one;

1, in the construction industry and foreign trade data synchronization problems. I Department organized three information officer, responsible for the collation of information within the industry, and foreign industry can simultaneously.

five. Security control the situation:
1. Subgrade works:
the quality of work orders this month, a, Ministry of I project to project chief engineer, bridge engineer, the laboratory group to actively implement the rectification has been completed all the rectification has been found in the corrective work orders requirements.


2) cap tie beam: plans to complete 65

4) Cover Beam: 46 project completion
Yan Wu Highway LJ-15 standard project department May 30, 2010

III. This month the completion of program objectives, not completed analysis and next steps:
First of all thank the leadership at all levels and units in May neighbor has given me great support and help the Ministry, on the progress of construction in May,[link widoczny dla zalogowanych], plans next month to report the situation and the implementation of the rectification is as follows: one. Site last session the implementation of the rectification problem:
3, strengthen the construction of access roads renovation and conservation issues, the Department arranged with the human loader repair sidewalks, pavement smooth flow of current to meet the construction needs, and arrange for two daily non-stop watering sprinkler , so that no dust pavement.


1) Scheme value: 1700 million to complete the 19.408 million yuan to complete the percentage of 114.2%;
quality assurance system, safety system personnel are in place to ensure that the system worked well, the department staff are in place in normal working condition.
3) Pier: plans to complete 83
4, sand: 4054.2 square approach, testing 21 times, qualified 21 times.
1. This month completion:


2) Pile: Plan 160, completed 170;

for April 29, 2010 LJJ-5 resident to do the 5th regular meeting site, the supervisor group leader Liu raised the issue and management of Department 4 , the chief asked me to do the project proposed the implementation of the Ministry of active rectification: China paper Alliance finishing.




4) tie beam: Plan 39 to complete 29:






2. Bridges and Culverts:
II. Project department quality assurance system, personnel safety assurance system in place and functioning:

4) Culverts: plans to complete a
9) 0.5 Articles protection program,[link widoczny dla zalogowanych], complete 0.55 Articles;

3) Caps: Plan 13, to complete one;
total output value of the month program: 16.14 million yuan, of which

1) embankment fill: Plan completion of 3 Articles

1, bar: approach 792.47T, testing 53 times, qualified 53 times.
this month by QC, the Engineering Department and Laboratory of construction quality, measurement and control, raw materials, concrete mix and other self-inspection, verification and reporting.
Cool Fill: 1.8 Articles plan, did not start.
5) precast box: plans to complete 115

3) special subgrade treatment: completion of 0.5 Articles


5) Protection Project: completion of 0.1 Articles
as security control, the ministry under the operating conditions in order to secure the safety of inspection teams led by engineers, under the sub: manual digging operations, blasting operations, aerial work, construction, electrical work, etc. 4 Project Group 24-hour on-site inspection and rectification, especially in going into the season, I have been in the Department of May 27, 2010 in a instructions. Flood safety inspection by the special teams and work teams to carry out safety inspections of construction charge.
5) Column: Plan 81, completed 67;


mortar specimens of 40 groups (7 days), 53 groups paste specimens (7 days), the above and the concrete strength test specimens were satisfactory.



2) Foundation excavation: plans to complete 5 Articles
2, cement: approach 2202T, testing 26 times, qualified 26 times.
More articles related to topics:


[link widoczny dla zalogowanych]

MBT Schuhe günstig Railway Locomotive party safet

[link widoczny dla zalogowanych]


The post has been approved 0 times
Back to top
View user's profile
Display posts from previous:   
Post new topic   Reply to topic    Forum pracy nad projektem wskrzeszenia The Forge Forum Index -> Forum All times are GMT + 2 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

fora.pl - załóż własne forum dyskusyjne za darmo
Powered by phpBB © 2001, 2005 phpBB Group
Regulamin